Finished bathroom renovation in a Burnaby home with greige tile and oak vanity

Bathroom Reno in Burnaby: Costs, Timelines & What to Expect

A bathroom reno in Burnaby usually takes three to five weeks and costs $12,000 to $25,000 for a standard renovation, though a full gut in a Metrotown condo or an older east Burnaby house runs higher. The biggest variable is what sits behind the walls.

This guide covers real 2026 cost ranges, how long the work takes, when the city requires a permit, and what a bathroom renovation in Burnaby runs into that a quick quote tends to miss.

How much does a bathroom reno in Burnaby cost?

A standard bathroom reno in Burnaby costs $12,000 to $25,000 in 2026: a new tub or shower, tile, vanity, toilet, lighting, fan, and paint in a typical 5-by-8 layout with fixtures staying put. A full gut with a layout change, a curbless shower, or a heated floor runs $30,000 to $60,000 and up.

Two things move the price: whether plumbing relocates, and what condition the substrate is in once it is opened. Moving a drain means opening the floor and re-running the stack, which adds labour and usually a permit. In older east Burnaby homes we regularly find cast-iron drain lines corroded at the hub joint and worth replacing while the wall is open, which is half a day of work no walkthrough quote includes. A lump-sum quote hides that, so ask for the prep and demolition line separately. Our Vancouver bathroom renovation cost guide breaks the numbers down by scope and applies closely to Burnaby.

Opened bathroom floor in an older Burnaby home showing cast-iron drain replacement

How long does a bathroom renovation in Burnaby take?

A standard bathroom renovation in Burnaby takes three to five weeks from demolition to final walkthrough. Roughly a week goes to demolition and rough-in, a week to waterproofing and tile, and the rest to fixtures, grout cure, glass, and paint.

The schedule stretches when a permit or strata approval sits in the critical path. A same-footprint refresh can start within days; a layout change that needs a City of Burnaby plumbing permit adds one to three weeks before work begins, and strata approval in a high-rise adds more. Tile choice matters too: large-format porcelain needs a flat substrate, so an out-of-level floor, common in post-war Burnaby bungalows, needs a self-levelling pour and an extra cure day before tile. A heated floor adds an electrical inspection before tile covers the mat; booked early it disappears into the cure time, booked late it becomes several idle days with the bathroom out of service.

Large-format porcelain tile samples and a level on a bathroom subfloor

Do you need a permit for a bathroom renovation in Burnaby?

You do not need a permit in Burnaby for a like-for-like cosmetic update. Swapping a vanity, toilet, tub, tile, or fan in the same spot is maintenance. You do need one once you relocate plumbing, add or move electrical circuits, or change anything structural.

Most “refresh” projects skip the permit and most “renovation” projects need one. Moving the shower, adding a heated-floor circuit, removing a wall to enlarge the room, or converting a tub to a curbless walk-in shower all cross that line. For a condo, strata approval is a separate step on top of the city permit, and most Burnaby buildings want proof of a licensed plumber and insurance first. Skipping a required permit surfaces at resale during an inspection and can mean opening finished walls. Our Burnaby bathroom renovation team files the permit and strata paperwork as part of the job.

What should Burnaby homeowners know before starting?

The biggest factor in a Burnaby bathroom project is the age and type of your home, because it decides what the crew finds behind the tile. Burnaby’s housing splits into two worlds that renovate differently.

Post-war bungalows and character homes in east Burnaby and the Heights tend to have plaster walls, plank or early-plywood subfloors, cast-iron or galvanized plumbing, and rooms that are out of square. These need substrate levelling, sometimes partial re-piping, and a tile layout set to the walls rather than the room’s sightlines. Otherwise the finished floor reads as crooked even when every tile is level. Concrete high-rises around Metrotown and Brentwood remove the subfloor worries but bring acoustic-underlay requirements, a rarely-flat slab, and no easy way to recess a linear drain without strata engineering sign-off.

Waterproofing is the step we will not cut. We use a Schluter KERDI bonded membrane over KERDI-BOARD rather than a liner behind cement board, because a bonded assembly can be inspected before tile and is what the Schluter system warranty requires. It costs more up front, and in a wet climate it earns that back.

Schluter KERDI waterproofing membrane installed in a Burnaby shower before tile

Frequently Asked Questions

How much does a small bathroom renovation cost in Burnaby?

A small or powder-room renovation in Burnaby usually runs $6,000 to $12,000, and a standard main bathroom $12,000 to $25,000. The low end assumes fixtures stay put and finishes are mid-range; the high end reflects moved plumbing, custom tile work, or a full layout change.

Can you renovate a condo bathroom in a Burnaby high-rise?

Yes, and it is routine work in Metrotown and Brentwood towers. The differences are procedural: strata approval, proof of licensed trades and insurance, booked elevator and work-hour windows, and acoustic underlay under new tile. Build in an extra two to four weeks for approvals.

Should I pull the permit for my Burnaby bathroom reno myself?

Your contractor should pull it. A licensed renovation company files the City of Burnaby permit and any strata submission, and is named as the party responsible for inspections. If a contractor asks you to take out an owner permit for work their business is doing, treat it as a warning sign.

Finished curbless walk-in shower in a Burnaby condo bathroom by RT Stone & Tile

Planning a Bathroom Renovation in Burnaby?

A realistic Burnaby bathroom budget is $12,000 to $25,000 for a standard renovation and three to five weeks of work, with older homes and high-rise condos each adding their own steps. Knowing which one you have before you start keeps the project on schedule.

RT Stone & Tile has renovated bathrooms across Burnaby, from Metrotown condos to character homes in the Heights, with Schluter-certified waterproofing on every one. If you are searching for a bathroom renovation near me in Burnaby, contact us or call 604.781.2510 to book a walkthrough, or see our bathroom renovation services.

Unmarked contractor van parked outside a Coquitlam home during a renovation delivery

Hiring a Tile Contractor in Coquitlam: A Local Guide

Two homes a ten-minute drive apart in Coquitlam can need completely different approaches to the same tile job. A 1940s character house in Maillardville, a 2019 build on a Burke Mountain slope, and a tower unit in Burquitlam share a postal region and almost nothing else structurally.

That is the practical case for hiring a tile contractor in Coquitlam who actually works here regularly. This guide covers what changes by property type, how the local permit process affects your schedule, and where local experience saves real money — rather than how to vet credentials in general, which applies anywhere.

What Makes Coquitlam Tile Projects Different

Coquitlam’s housing stock spans roughly eighty years of building practice, and the substrate under your floor is a product of whenever your house went up.

Older homes in the Maillardville area often sit on plank subfloors or early plywood, sometimes with a layer or two of previous flooring still in place. These floors frequently need levelling and stiffening before tile can go down, and that assessment has to happen before anyone quotes a number.

Newer construction on the northeast slopes is the opposite problem. The framing is modern and sound, but sloped-lot builds often mean long spans, engineered joists, and multi-level layouts where tile transitions between materials at every landing. Getting those transitions flat and durable is where the labour goes.

Tower and townhome units are a third case again. The structure is concrete rather than wood, which removes the deflection worry but introduces acoustic requirements and a slab that moves on its own schedule. Each of the three calls for a different prep approach, and the flooring services quote should reflect which one you actually have rather than a generic square-foot rate.

Comparing tile and grout colour options against a wall

Permits, Inspections, and Your Actual Timeline

Most straightforward tile replacement does not require a permit. Replacing a floor covering on an existing sound subfloor is maintenance, not construction.

What does trigger a permit is anything structural or mechanical: moving a wall, relocating plumbing for a new shower position, altering drainage, or adding electrical for in-floor heat. Once your project crosses that line, the City of Coquitlam’s review and inspection schedule becomes part of your timeline, not a footnote to it.

The practical impact is sequencing. An inspection that has to happen before tile goes over in-floor heat can add days if it is booked late. A contractor who works in the city regularly books those inspections at the right moment instead of discovering the requirement halfway through demolition.

A heated bathroom floor is the clearest example. The electrical rough-in is inspected before anything covers it, so the crew has to stop after the mat is laid and wait. Booked in advance, that pause disappears into the normal cure schedule and costs nothing. Booked after the fact, it becomes several idle days with a bathroom out of service — the same work, the same price, a materially worse week for the household.

Renovation permit paperwork and site plan on a work truck tailgate

Matching the Contractor to Your Property Type

Character Homes and Older Housing Stock

For homes built before the 1970s, the questions worth asking are about substrate remediation: how they assess deflection, whether they have dealt with plank subfloors, and how they handle out-of-square rooms. Older houses settle, and a contractor who lays out to the walls rather than to the room’s sightlines will produce a floor that looks visibly crooked even though every tile is level.

Hillside and Newer Builds

On sloped lots, ask about transitions and movement. Long uninterrupted runs of tile across a modern open plan need movement joints, and multi-level layouts need a plan for how tile meets hardwood, carpet, or an exterior threshold at each change.

Condos and Townhomes

Buildings bring strata rules, acoustic underlay requirements, elevator bookings, and restricted work hours. A crew that regularly does bathroom renovations in local towers already has that paperwork rhythm; one that mostly works in detached houses will be learning it on your schedule. This is equally true across Burnaby and neighbouring municipalities, where building-specific rules vary more than most homeowners expect.

What Local Experience Actually Buys You

Beyond the technical fit, working with a contractor who is genuinely active in the area changes three practical things.

  • Realistic scheduling — they know current inspection turnaround rather than guessing
  • Supplier access — established accounts mean shorter lead times on tile and setting materials, and a faster route to matching material if a box arrives damaged
  • Accurate quoting — repeated exposure to the same housing types means fewer mid-project surprises about what is under the floor
  • Accountability — a contractor with local referral business has more at stake than one passing through

None of this replaces checking credentials and insurance, which matters regardless of where you are. It is the layer on top of that, and it is the part a homeowner in Delta or anywhere else cannot easily evaluate from a website alone.

Contractor cutting tile with a wet saw during an installation

Cost Expectations for Coquitlam Tile Work

Installed pricing generally lands between $12 and $28 per square foot, in line with rates across Vancouver and the wider region. The spread comes mostly from prep and pattern rather than the tile itself, and the types of tile under consideration set the floor for that range rather than the ceiling.

Older-home projects tend to run higher because of substrate work — levelling compound, subfloor reinforcement, and removing previous layers all add cost before the first tile is set. Newer builds usually need less remediation but often involve larger continuous areas and more transitions.

Budget a 10 to 15 percent contingency on any project in a home over thirty years old. Opening up a floor reveals what is actually underneath, and older houses are where that most often differs from the assumption. Homeowners across the Lower Mainland consistently find that the contingency, not the quote, is what keeps a project calm.

Frequently Asked Questions

Do I need a permit to retile a bathroom floor?

Usually not, if you are replacing a floor covering over a sound existing subfloor. A permit is generally required once plumbing is relocated, walls are altered, or electrical is added for heated floors. Confirm with the city before demolition rather than after.

How far ahead should I book a tile contractor?

Six to ten weeks is typical for established crews, and longer heading into spring and early fall when demand peaks. Add lead time if your tile is a special order, since imported material can take considerably longer than what is in local stock.

Is a contractor from outside the area a bad choice?

Not automatically. A skilled installer is a skilled installer. The trade-off is that they may be less current on local inspection scheduling and building-specific strata requirements, which tends to show up as timeline slippage rather than poor workmanship.

Should I choose a specialist or a general renovation company?

If tile is the main scope, a specialist usually gives a better result for the money. If tile is one part of a larger project involving several trades, a renovation company that coordinates the whole sequence is often worth the premium. The distinction holds anywhere in the region, including Richmond and the surrounding municipalities.

Finished kitchen tile backsplash installed by RT Stone & Tile

Planning a Tile Project in Coquitlam?

The right tile contractor for your project depends heavily on what kind of building you own. Character homes reward substrate expertise, hillside builds reward careful transition planning, and condos reward a crew that already knows the strata routine.

RT Stone & Tile works across Coquitlam and the surrounding region on all three, and we are happy to walk your space and talk through what your particular subfloor needs. Contact us or call us at 604.781.2510 to get started.

Finished tiled entryway in a Richmond home during wet weather

Tile Installation in Richmond: What a Proper Job Involves

Most tile failures are not caused by choosing the wrong tile. They are caused by problems underneath it. Cracked grout lines after two winters, hollow sounds underfoot, or a shower base that never fully dries can often be traced back to preparation work that was rushed before the first tile was set.

Anyone planning a tile installation in Richmond should understand what a proper job involves. This guide explains each stage of the process, what can go wrong, and why Richmond’s local conditions make certain installation details especially important.

Why Tile Installation in Richmond Has Its Own Challenges

Richmond sits on low, flat land with a high water table, and much of its housing stock is built on slab-on-grade or over crawl spaces close to the ground. That combination means ground-level floors deal with more moisture from below than a comparable home built on a hillside would.

Add the wet weather that typically lasts from October through March and you get two moisture fronts at once — one rising from the slab and the other being tracked in through entryways. Tile handles both well when it is installed over the right substrate and membrane. Installed directly onto an unprepared slab, it becomes a lid over trapped moisture, and the grout is usually the first thing to show it.

Condos and townhomes bring a second variable. Many buildings sit above parkade structures, where the concrete deck can experience seasonal movement that affects the finished tile surface. Without the right layer between slab and tile, that movement transfers directly into the tile.

The Steps a Proper Tile Installation Should Include

A quote that lists “supply and install tile” and nothing else is hiding most of the actual work. Here is what should be happening between demolition and grout, whether the job is part of our flooring services or a full room renovation.

Subfloor Assessment and Levelling

Before anything is ordered, the substrate gets checked for flatness, structural movement, and moisture. Industry tolerance for large-format tile is roughly 1/8″ of variation over 10 feet — tighter than most existing floors, which is why self-levelling compound so often turns up on a properly written quote.

Skipping this is the single most common cause of lippage, the uneven tile edges you can feel with a bare foot. On a wood subfloor, deflection matters too: a floor that flexes underfoot will crack a rigid tile surface no matter how good the adhesive is.

Contractor levelling a subfloor before installing tile

Waterproofing and Uncoupling Membranes

These two get confused often, and they do different jobs. A waterproofing membrane keeps water from passing through to the structure — essential in showers, tub surrounds, and any wet room. An uncoupling membrane lets the substrate and the tile move independently, so a shifting slab does not telegraph a crack straight up through the finished floor.

Systems like Schluter’s DITRA and KERDI are the ones we specify most often, because on a ground-oriented floor in this climate you frequently want both functions at once. Homeowners across the Lower Mainland sometimes see these membranes as an upsell. They are closer to insurance — the cost of adding one is a fraction of what it costs to tear out a failed floor and start again.

Uncoupling membrane installed over a residential subfloor

Layout, Setting, and Movement Joints

Layout is planned before adhesive is mixed, so cuts land in sensible places and the pattern stays aligned with the room’s most visible sightline rather than with a wall that may not be perfectly straight.

During setting, coverage matters more than speed. Large-format tile generally needs close to full mortar contact, which usually means back-buttering each piece. Movement joints — soft joints of flexible sealant rather than rigid grout — belong at perimeters and at intervals across larger floors. Leave them out and the floor has nowhere to expand, which is how you get tenting, where tiles lift off the substrate entirely.

Where Installations Commonly Go Wrong

Most of the failures we are called to repair can be traced back to a small number of shortcuts.

  • Tiling directly over an old floor without checking whether the layers underneath are sound
  • Skipping the membrane on a ground-level slab or shower wall
  • Spot-bonding — using five dabs of mortar per tile instead of achieving full coverage — which leaves hollow voids that can crack under load
  • Omitting movement joints, especially on floors that run continuously between rooms
  • Grouting too early, before the mortar has cured, which can compromise the installation and discolour the grout

Homeowners who have lived through one of these repairs tend to ask far more detailed questions the second time around — and rightly so. The repair almost always costs more than doing it correctly would have.

Strata Approvals and Scheduling for Richmond Condos

For condo and townhome projects, the paperwork can take longer than the tiling. Most strata corporations require written approval before work starts, along with proof of contractor liability insurance and, increasingly, an acoustic underlay that meets the building’s minimum impact-sound rating requirements, particularly for units above the ground floor. The same applies to bathroom renovations in these buildings.

Build that approval window into the schedule rather than treating it as a formality. Noise-restricted work hours also compress a crew’s productive day, which stretches a job that would take four days in a detached house into a week or more.

Installing the same square footage of tile in a Delta rancher and in a fourth-floor condo can involve two very different projects once access, elevator bookings, and material staging are taken into account — worth remembering when comparing a quote for one against a quote for the other.

Homeowner reviewing a tile layout with an installer

Cost and Timeline Expectations

Tile installation across Vancouver and the surrounding region generally costs between $12 and $28 per square foot, depending on tile format, pattern complexity, and how much prep the substrate needs. Large-format and herringbone layouts sit at the higher end because both take longer to set and generate more cuts. The type of tile you choose accounts for a significant part of that price range, and the types of tile available vary widely in cost.

Prep is the line item that moves most. A flat, sound slab may need almost nothing; a floor requiring levelling compound, membrane, and old-adhesive removal can add several dollars per square foot before a single tile is placed. This is exactly why two quotes for the “same” job can differ by thousands — and why the breakdown matters more than the total.

In terms of timeline, a standard bathroom floor and surround typically takes three to five working days, including curing time. A full main floor typically takes one to two weeks. Curing time is not padding; grouting or allowing foot traffic too early can compromise the installation.

Frequently Asked Questions

How long should I stay off a newly tiled floor?

Plan on 24 hours before light foot traffic and 72 hours before replacing heavy furniture or appliances. Mortar and grout gain strength over days, not hours, and early loading is a common cause of hairline cracks that only show up weeks later.

Can tile be installed over an existing tile floor?

Sometimes, if the existing floor is fully bonded, flat, and the added height will not create problems at doorways or appliances. It is worth an honest assessment first — homeowners often find that removal costs less overall than the repair bill when a compromised base fails under the new layer.

Do I need a membrane on a ground-floor slab?

In most cases here, yes. Slab-on-grade floors in low-lying areas transmit both moisture and seasonal movement. An uncoupling membrane can help manage substrate movement, while an appropriate moisture-control or waterproofing system may also be required. Your installer should be able to explain which membrane system they recommend and why it is appropriate for your substrate.

What should a detailed tile quote actually include?

It should separate demolition and disposal, substrate prep, membrane, setting materials, tile, grout and sealant, and labour. A single lump sum makes it impossible to tell whether prep was included or quietly left out, which is the most common reason a low quote grows once work begins.

Finished tiled bathroom installed by RT Stone & Tile

Getting the Foundation Right the First Time

Good tile work is mostly invisible. The levelling, the membrane, the movement joints, the curing time — none of it shows in a finished photo, and all of it determines whether the floor still looks right in ten years.

RT Stone & Tile installs tile across Vancouver and the surrounding region, and we are happy to review the substrate and membrane plan for your space before moving on to tile selection. Contact us or call us at 604.781.2510 to get started.